The Airfield and Terminal Modernization Project (ATMP) is a set of planned airfield and terminal improvements that will be implemented within the airport’s existing footprint, in addition to landside (roadway) improvements that will help reduce airport-related congestion and back-ups on public streets. The project is intended to elevate the passenger experience, improve the community experience, enhance airfield safety and increase business opportunities.
The project's Final Environmental Impact Report (FEIR) was released in August 2021 and was certified by the Los Angeles Board of Airport Commissioners in October 2021.
In 2024, LAWA officials announced the postponement of the project’s terminal improvements implementation.
Airfield Improvements
The project's airfield improvements are focused on improving runway exits to enhance safety, better manage airfield operations and incorporate improvements to access new concourse and terminal facilities. Additionally, Airfield Improvements:
Terminal Improvements
Terminal improvements include the creation of two new ground-up facilities: Terminal 9 and Concourse 0. Concourse 0 will feature:
Terminal 9 will feature:
Landside Improvements
As part of the project's landside improvements initiative, Central Terminal Area access will be enhanced simultaneous to the creation of direct access to Terminal 9. These improvements will help reduce congestion on public thoroughfares and neighborhood streets by separating airport traffic from local traffic on an elevated roadway system. A new Automated People Mover station will be built to provide access to Terminal 9, while a pedestrian corridor over Sepulveda Boulevard between Terminals 8 and 9 will be created.