Activity:

To facilitate work for the Roadway and Utility Enabling (RUE) Project, all westbound through traffic and two eastbound lanes on Century Blvd. at Concourse Way (between La Cienega Blvd. and Aviation Blvd.) will be closed continuously from Friday, April 26 at 9 p.m. to Sunday, April 28 at 4 p.m.

Westbound Century Blvd. will be limited to local access only, with westbound through traffic detoured via northbound La Cienega Blvd., westbound Arbor Vitae St. and southbound Aviation Blvd. (see Detour Map below).

Two lanes on eastbound Century Blvd. will be maintained at all times. Access to and from Concourse Way will be maintained via eastbound Century Blvd. at all times (there will be no access via westbound Century Blvd. during this work). A U-turn will be available from westbound Century Blvd. at Aviation Blvd. to reach eastbound Century Blvd. and/or Concourse Way.

All traffic, including access to local businesses and driveways, will be maintained at all times. Additional mitigation measures include:

  • Flaggers and signage
  • DOT Traffic Control Officers aiding with the flow of traffic through the intersection during key project transitions
  • On-duty LAWA Airport Operations staff monitoring and mitigating potential traffic impacts
  • Noise mitigation measures including noise monitoring and sound blankets


Please plan ahead for potential delays, always observe posted signage, remain alert and use caution when traveling near construction areas.


 

Dates and Work Hours:


  • Continuously from Friday, April 26 at 9 p.m. to Sunday, April 28 at 4 p.m.

 